Client: Seymour Whyte Constructions

Project commencement: Feb 2012 – July 2102

Project: Stormwater Drainage Thornton Rail Bridge Upgrade

Description of works: Installation of 375mm to 525mm RCP Stormwater and associated pits

Key Features: Installation of stormwater pipe through large swamp area and installation of pipes within the rail corridor
Client: Cessnock Council

Project Commencement: Jan 2010 completed Feb 2011 works carried out in three stages

Project Value: $456,000.00

Project Information: Installation of 375mm,450mm,525mm and 600mm Concrete storm water pipe and associated pits and scour protection.

Key Features: completing works within councils works programme, carrying out works keeping road open for all local traffic.
Client: Dept. Housing

Project: Basement car park excavations

Project Value: $585,000.00

Project Information: RME carried out continuous pilling on all Boundaries, Bulk excavation and Haulage of 11,200m3 of clay and rock.

Key Features: Removal of 6m of Sydney sandstone with site condition set under the DA that no Hydraulic Hammering could not be undertaken due to surrounding residents and Doctors surgeries. Works were under taken with rock sawing and ripping by excavator only.

Client: Linx Group

Project: 4 block sub division Lane Cove Sydney

Project Value: $620,000.00

Project information: Construction of key stone retaining walls for access road and off street parking, construction of overland flood culverts, site landscaping and all concrete works.
Client: Delta Electrical

Project: Removal and Haulage of 30,000m3 of Coal

Project commencement: Dec 2012  completed Jan 2013

Project Value: $50,000.00

Project Information: Joint venture with JE Hogan Haulage to load and cart stockpiled coal from power station shut down on the Central Coast NSW.
Client: Nace Civil Engineering

Project commencement: Dec 2010 completed Jan 2014

Project: Central Coast Highway Upgrade from Matcham Rd to Oceanveiw Dr Wamberal

Value: $5.85 Million

Project information: RME were contracted to carry out all Bulk and detailed earthworks, Bulk Haulage, Pavement construction, Sub soil Drainage, preparation for concrete works.

Key Features: 159,000m3 cut and fill, 83,015m3 of spoil removal, 26,558m3 Imported sandstone pavement, 18,000 Tonnes Hanson’s Enviro Heavy Bound pavement.

8.23 Kms of Sub Soil Drainage, Excavations for Pilling platform through wet lands and flooding creek areas to install three cell culverts.

Central Coast Highway (The Entrance Rd) Wamberal
for Seymour Whyte Constructions Pty Ltd
March 2007 - July 2008.

Works undertaken:
  • All bulk and final trim excavation works
  • Subsoil drainage and siltraton control
  • Placement and compaction of select road sub-base
  • Placement of steel stone mix3
  • Retaining wall footing excavations and backfilling
  • All footpath preparation works
  • Property adjustments (drive ways, landscaping)
  • Street scape (top soil, garden, mulching)
  • Removal of obsolete services (water mains, sever mains and manholes & telstra pit and ducting)
  • Road Sweeping (Bobcat)
Residential Unit development,
Masons Parade Gosford

for Rolfe Constructions
February 2008

Works undertaken:
  • All site Excavation work
  • Building basement excavations
  • Bulk haulage
  • Final trim for building platform
  • Sub soil and ground water drainage
Australia Post Regional Mail Centre Warabrook 
for Classic Group Pty.Ltd.
July 2006 - November 2006.

Works undertaken:
  • All bulk and final trim excavations
  • Removal of existing roadway and kerb
  • Onsite treatment of acid sulphate soil
  • Construction of retention tank and pond
  • Placement of select sub base
  • Construction of timber retaining walls
  • Placement of Reno mattress scour protection
  • Landscaping works

Client: Seymour Whyte Construction

Project Commencement: June 2009 completed Oct 2010

Project: Avoca Drive Green Point

Value: $385,000.00

Project Information: RME were contracted to Carry out Clearing of work site, Bulk and Detailed excavations, Pavement construction, Sand stone wall construction within active Creek and wet lands area.

Key Features: Bulk Excavation of 18000m3 filling of 8500m3, all works carried out in a very environmental sensitive area and a very tight project programme.